Historical Information
1. Dam Name: North River Road
2. Estimate height of dam in feet 1-2'
3. Dam Type:
a) earthfill dam ____
b) concrete arch dam ____
c) gravity dam ____
d) masonry dam ____
e) timber cribs ____
f) other, please explain X pile of rocks impeding river flow.
4. Location Description: Dam above S.R. 45 bridge (Summit St.) in Warren
5. Year Constructed:________
6. Dam Owner:
a) public ____
b) private: X CSC Steel Co.
c) abandoned ____
7. Dam Function:
a) generate hydropower ____
b) irrigation ____
c) domestic water supply ____
d) navigation ____
e) flood control ____
f) recreation ____
g) industrial water supply: X
h) unknown ____
8. What repairs have been done to the dam? None
9. Reason(s) for Removal:
a) aesthetic enhancement: X
b) fish and wildlife habitat improvement: X
c) cost savings ____
d) community revitalization: X
e) public safety hazard ____
f) water quality improvement: X
g) recreational improvement: X
h) alternative to dam ____
10. Project Sponsor (who initiated project): ODOT, Trumbull County Planning
Commission, Eastgate and Mahoning River Consortium
11. Dam Removal Funding Sources:
a) federal ____
b) state: ODOT
c) local governmental agencies ____
d) other (please explain) _________
12. Cost of Dam Removal: $46,861
13. List all Contractors by Name, include Address and Telephone #:
1) Kirila Contractors Inc.
14. Permits Required:
a) federal: X
b) state____
c) municipal: X
15. Dam Photographs:
a) before removal: X
b) during removal: X
c) after removal: X
16. Problems Encountered:
a) before removal: None
b) during removal: None
c) after removal: None
17. Before Removal:
a) Estimated Reservoir Area in acres______________________
b) Composition of river bed (e.g., sand, pebbles, boulders, bedrock)
c) Types of Fish caught in the river________________________
d) Water Quality
i) behind the dam Good____ Fair : X Poor______
ii) below the dam Good____ Fair ______ Poor: X
18. Were any studies of the river conducted before the dam was removed?: Yes
If yes, who conducted the studies and who is the contact for obtaining them?
Hydraulic and contamination analysis have been conducted at this site by NS Consultants.
19. Have studies been conducted on the river after the dam was removed to
document changes in the river?: Yes
If yes, who conducted the studies and who is the contact for obtaining them?
NS Consultants have been hired by ODOT to perform periodic testing of the site for a period of five years.